Project name | Placement of a hothouse complex |
Industry classification | Agriculture |
Basic information about the project |
---|
Project essence | As a part of a hothouse complex greenhouses from the facilitated designs on a metalframework, subsidiary constructions, the platform for sorting and temporary storage of finished goods, subsidiary constructions for storage of stock and fertilizers will be built |
Project capacity | Cucumbers – 25 704 t; Tomatoes – 13 056 t; Pepper – 2 679,9 t; Salad – 489,6 t |
Consumer market description | Wholesale companies, retail, canneries |
Object construction term | 2.00 |
Competitive advantage | Environmentally friendly production, flexible system of pricing |
Resource availability for project realization | Is available |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 320.00 |
Planned volume of gas consumption (annual), million cubic meters | 2.75 |
Planned volume of water consumption (annual), million cubic meters | 2.50 |
Degree of project development | The feasibility study is developed, the land plot is created |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 17221.29 |
Own resources, million rubles | |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | 17221.29 |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary |
Payback period | 4.25 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 13370.79 |
Simple payback time | 4.25 |
Discounted payback period | 4.75 |
Internal rate of return (IRR) | 9.86 |
Productivity index (PI) | 1.65 |
Income per year | 24844.29 |
Social efficiency of investment project |
---|
Number of workplaces | 553 |
Salary average level (thousand rub per year) | 270.36 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 5506.07 |
which includes into consolidated budget of the krai, million rubles | 3357.76 |
General information about the ground area |
---|
Address of the area | Krasnodar Krai, municipality Kushchevsky district, 1 km to the west of Kushchevskaya's village |
Cadastre account of ground area | Registered |
Cadastre number of area/of quarter | 23:17:01020004:1 |
Declared area (m2) | 977463.00 |
Limit size of the area (m2) | 977463.00 |
Land category | Agricultural land use |
Kind of allowed use | Agricultural activity |
Actual use | Cultivation of crops |
Availability of buildings, structures, constructions | No |
Permits, town-planning documentation | The scheme of territorial planning of municipality Kuschevsky district is developed under the municipal contract No. 9 of 20.03.2007 by JSC Institute of Territorial Development of Krasnodar region. The decision No. 153 of February 25, 2011 (About app |
Information about proprietor (right holder) |
---|
Proprietor | State ownership |
Right holder | Krasnodar region |
Kind of right | Constant (termless) using |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | Rent to “UVN” Uzbekov V.N |
Encumbrance area | 977463.00 |
Electricity supply |
---|
Power supply center (name, right-holder) | PS "Elevator", JSC Kubanenergo |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | 1.00 |
Power supply center (distance(m)) | 950.00 |
Nearest connection point (network tension, kV) | 380.00 |
Nearest connection point (distance(m)) | 950.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | gas pipeline of the High Pressure, JSC Gazprom |
Gas pipeline (diameter(mm)) | 110.00 |
Gas pipeline (pressure(MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
Gas pipeline (carrying capacity(cube. m.in a year)) | |
Gas pipeline (distance(m)) | 500.00 |
Nearest connection point (diameter(mm)) | 110.00 |
Nearest connection point (pressure (MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
Nearest connection point (carrying capacity (cubic meter a year)) | |
Nearest connection point (distance(m)) | 950.00 |
Water-supply |
---|
Water supply source (name, right-holder) | Construction of an artesian well |
Water supply source (power (cubic meters a day)) | 10000.00 |
Water supply source (quality of water) | Service water |
Water supply source (distance(m)) | |
Nearest connection point (power (cubic meters a day)) | 10000.00 |
Nearest connection point (diameter(mm)) | |
Nearest connection point (distance(m)) | |
Sewage system |
---|
Type of building (name, right-holder) | Treatment facilities of a Municipality Administration Kuschevsky district |
Type of building (power (cubic meters a day)) | 7500.00 |
Type of building (distance(m)) | 100.00 |
Nearest point of connection (power (cubic meters a day)) | 7500.00 |
Nearest point of connection (diameter(mm)) | 300.00 |
Nearest point of connection (distance(m)) | 100.00 |
Installation of telephones/internet |
---|
Central network (distance(m)) | 3000.00 |
Mobile communication (distance(m)) | 4500.00 |
Rated price of the ground area supplying with engineering, mln.rub | 881.80 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Kuschevskaya | 1.00 |
nearest settlement | Kuschevskaya | 1.00 |
Center of federal subject | Krasnodar city | 221.00 |
highways (regional, federal value) | Federal motorway Ì-4 "Don" | 12.00 |
highways of local value | «Kuschevskaya-Starominskaya» | 1.50 |
nearest railway station | Kuschevka | 2.50 |
nearest railway | JSC RZD | 0.90 |
airport | Yeysk airport | 112.00 |
seaport | seaport Yeysk | 112.00 |
Additional information about the ground area |
---|
Special conditions | Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win |
Cost of rent/buy of the ground area, mln. rub | 0.78 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 46.342793 |
Longitude (E) | 39.33350000 |
Notes | No |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | No |
Postal address | No |
Site | No |
Phone/fax | No |
E-mail address | No |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Administration of municipal formation Kushchevsky district |
Postal address | 352030, Russia, Krasnodar region, village Kuschevskaya, B.E.Moskvicha Lane, 67 |
Site | www.adm-kush.ru |
Phone/fax | +7-86168-558-33 |
E-mail address | economkush@mail.ru |
Executive (Full name, work position, phone number) | +7 (86168)54101 head of department of investments and interaction with small business of Kulikov Sergey Alexandrovich |