Project name | Placement of a logistic complex on storage and primary conversion of fruit and vegetable products |
Industry classification | Agriculture |
Basic information about the project |
---|
Project essence | Within the project construction of the industrial complex consisting from is planned: shops on acceptance, sorting and preprocessing of fruit and vegetable products, six modules expected storage of 3 600 tons of products everyone and two modules of primary conversion of products |
Project capacity | 21,3 thousand tons of simultaneous storage |
Consumer market description | Agricultural enterprises of Kuschevsky district, personal subsidiary farms |
Object construction term | 1.00 |
Competitive advantage | Absence of bases on storage and processing |
Resource availability for project realization | Seating of the land plot in a proximity from highways of federal and regional importance, an agricultural orientation of the district |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 53.10 |
Planned volume of gas consumption (annual), million cubic meters | 0.70 |
Planned volume of water consumption (annual), million cubic meters | 0.01 |
Degree of project development | The feasibility study is developed, the land plot is created |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 155.75 |
Own resources, million rubles | |
Means of regional (municipal) budget, million rubles | |
Previously involved means, million rubles | |
Investment capacity, mln rubles | 155.75 |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary, individual share |
Payback period | 5.50 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 112.83 |
Simple payback time | 5.50 |
Discounted payback period | 7.00 |
Internal rate of return (IRR) | 13.90 |
Productivity index (PI) | 1.30 |
Income per year | 68.24 |
Social efficiency of investment project |
---|
Number of workplaces | 25 |
Salary average level (thousand rub per year) | 259.20 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 17.75 |
which includes into consolidated budget of the krai, million rubles | 7.19 |
General information about the ground area |
---|
Address of the area | Krasnodar region, municipality Kuschevsky district, village Kuschevskaya , Chernomorka street, 45 |
Cadastre account of ground area | Registered |
Cadastre number of area/of quarter | 23:17:1404001:76 |
Declared area (m2) | 76422.00 |
Limit size of the area (m2) | 76422.00 |
Land category | Lands of inhabited localities |
Kind of allowed use | Agricultural activity |
Actual use | No |
Availability of buildings, structures, constructions | No |
Permits, town-planning documentation | General plan Kuschevskaya of rural settlement with reference to a part of territory item Kuschevskaya, approved by the decision of Advice of municipal formation area Kushchevsky from 7/24/2007 ¹ 524, Rules of land tenure and building of municipal for |
Information about proprietor (right holder) |
---|
Proprietor | State ownership |
Right holder | State ownership in charge of Kushchevskaya rural settlement |
Kind of right | Constant (termless) using |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | No |
Encumbrance area | |
Electricity supply |
---|
Power supply center (name, right-holder) | PS "Elevator", JSC Kubanenergo |
Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
Power supply center (free power (MWt)) | 0.75 |
Power supply center (distance(m)) | 100.00 |
Nearest connection point (network tension, kV) | 380.00 |
Nearest connection point (distance(m)) | 100.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | gas pipeline of the High Pressure, JSC Gazprom |
Gas pipeline (diameter(mm)) | 110.00 |
Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Gas pipeline (carrying capacity(cube. m.in a year)) | |
Gas pipeline (distance(m)) | 750.00 |
Nearest connection point (diameter(mm)) | 110.00 |
Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
Nearest connection point (carrying capacity (cubic meter a year)) | |
Nearest connection point (distance(m)) | 750.00 |
Water-supply |
---|
Water supply source (name, right-holder) | Construction of an artesian well |
Water supply source (power (cubic meters a day)) | 1000.00 |
Water supply source (quality of water) | Service water |
Water supply source (distance(m)) | |
Nearest connection point (power (cubic meters a day)) | 1000.00 |
Nearest connection point (diameter(mm)) | |
Nearest connection point (distance(m)) | |
Sewage system |
---|
Type of building (name, right-holder) | Construction of local treatment facilities |
Type of building (power (cubic meters a day)) | 25.00 |
Type of building (distance(m)) | |
Nearest point of connection (power (cubic meters a day)) | 25.00 |
Nearest point of connection (diameter(mm)) | |
Nearest point of connection (distance(m)) | |
Installation of telephones/internet |
---|
Central network (distance(m)) | 500.00 |
Mobile communication (distance(m)) | 1500.00 |
Rated price of the ground area supplying with engineering, mln.rub | 28.47 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Kuschevskaya | |
nearest settlement | Kuschevskaya | |
Center of federal subject | Krasnodar city | 220.00 |
highways (regional, federal value) | Federal motorway Ì-4 "Don" | 10.00 |
highways of local value | «Kuschevskaya-Starominskaya» | 2.00 |
nearest railway station | Kuschevka | 1.50 |
nearest railway | OAO “RGD” | 1.50 |
airport | Yeysk airport | 112.00 |
seaport | seaport Yeysk | 112.00 |
Additional information about the ground area |
---|
Special conditions | Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win |
Cost of rent/buy of the ground area, mln. rub | 0.54 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 46.334788 |
Longitude (E) | 39.35469000 |
Notes | No |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | No |
Postal address | No |
Site | No |
Phone/fax | No |
E-mail address | No |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Administration of municipal formation Kushchevsky district |
Postal address | 352030, Russia, Krasnodar region, village Kuschevskaya, B.E.Moskvicha Lane, 67 |
Site | www.adm-kush.ru |
Phone/fax | +7-86168-558-33 |
E-mail address | economkush@mail.ru |
Executive (Full name, work position, phone number) | +7 (86168)54101 head of department of investments and interaction with small business of Kulikov Sergey Alexandrovich |