| Project name | Placement of a logistic complex on storage and primary conversion of fruit and vegetable products |
| Industry classification | Agriculture |
| Basic information about the project |
|---|
| Project essence | Within the project construction of the industrial complex consisting from is planned: shops on acceptance, sorting and preprocessing of fruit and vegetable products, six modules expected storage of 3 600 tons of products everyone and two modules of primary conversion of products |
| Project capacity | 21,3 thousand tons of simultaneous storage |
| Consumer market description | Agricultural enterprises of Kuschevsky district, personal subsidiary farms |
| Object construction term | 1.00 |
| Competitive advantage | Absence of bases on storage and processing |
| Resource availability for project realization | Seating of the land plot in a proximity from highways of federal and regional importance, an agricultural orientation of the district |
| Planned volume of resource consumption (annual) |
|---|
| Planned volume of electricity consumption (annual), MWh | 53.10 |
| Planned volume of gas consumption (annual), million cubic meters | 0.70 |
| Planned volume of water consumption (annual), million cubic meters | 0.01 |
| Degree of project development | The feasibility study is developed, the land plot is created |
| Financial estimation of the project |
|---|
| Total cost of the project, mln rubles | 155.75 |
| Own resources, million rubles | |
| Means of regional (municipal) budget, million rubles | |
| Previously involved means, million rubles | |
| Investment capacity, mln rubles | 155.75 |
| Conditions of investor participation | Direct investments |
| Form of investments return | Monetary, individual share |
| Payback period | 5.50 |
| Basic indicators of investment project economic efficiency |
|---|
| Net present value (NPV) | 112.83 |
| Simple payback time | 5.50 |
| Discounted payback period | 7.00 |
| Internal rate of return (IRR) | 13.90 |
| Productivity index (PI) | 1.30 |
| Income per year | 68.24 |
| Social efficiency of investment project |
|---|
| Number of workplaces | 25 |
| Salary average level (thousand rub per year) | 259.20 |
| Budgetary efficiency of investment project |
|---|
| Mid-annual tax payments, million rubles | 17.75 |
| which includes into consolidated budget of the krai, million rubles | 7.19 |
| General information about the ground area |
|---|
| Address of the area | Krasnodar region, municipality Kuschevsky district, village Kuschevskaya , Chernomorka street, 45 |
| Cadastre account of ground area | Registered |
| Cadastre number of area/of quarter | 23:17:1404001:76 |
| Declared area (m2) | 76422.00 |
| Limit size of the area (m2) | 76422.00 |
| Land category | Lands of inhabited localities |
| Kind of allowed use | Agricultural activity |
| Actual use | No |
| Availability of buildings, structures, constructions | No |
| Permits, town-planning documentation | General plan Kuschevskaya of rural settlement with reference to a part of territory item Kuschevskaya, approved by the decision of Advice of municipal formation area Kushchevsky from 7/24/2007 ¹ 524, Rules of land tenure and building of municipal for |
| Information about proprietor (right holder) |
|---|
| Proprietor | State ownership |
| Right holder | State ownership in charge of Kushchevskaya rural settlement |
| Kind of right | Constant (termless) using |
| Information about encumbrance and limitation |
|---|
| Kind of encumbrance, limitation | No |
| Encumbrance area | |
| Electricity supply |
|---|
| Power supply center (name, right-holder) | PS "Elevator", JSC Kubanenergo |
| Power supply center (electrotension class) | Middle class of tension – from 1 kV to 35 kV |
| Power supply center (free power (MWt)) | 0.75 |
| Power supply center (distance(m)) | 100.00 |
| Nearest connection point (network tension, kV) | 380.00 |
| Nearest connection point (distance(m)) | 100.00 |
| Gas-supplying |
|---|
| Gas pipeline (name, right-holder) | gas pipeline of the High Pressure, JSC Gazprom |
| Gas pipeline (diameter(mm)) | 110.00 |
| Gas pipeline (pressure(MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
| Gas pipeline (carrying capacity(cube. m.in a year)) | |
| Gas pipeline (distance(m)) | 750.00 |
| Nearest connection point (diameter(mm)) | 110.00 |
| Nearest connection point (pressure (MPa)) | Average pressure pipelines – from 0,005 to 0,3 |
| Nearest connection point (carrying capacity (cubic meter a year)) | |
| Nearest connection point (distance(m)) | 750.00 |
| Water-supply |
|---|
| Water supply source (name, right-holder) | Construction of an artesian well |
| Water supply source (power (cubic meters a day)) | 1000.00 |
| Water supply source (quality of water) | Service water |
| Water supply source (distance(m)) | |
| Nearest connection point (power (cubic meters a day)) | 1000.00 |
| Nearest connection point (diameter(mm)) | |
| Nearest connection point (distance(m)) | |
| Sewage system |
|---|
| Type of building (name, right-holder) | Construction of local treatment facilities |
| Type of building (power (cubic meters a day)) | 25.00 |
| Type of building (distance(m)) | |
| Nearest point of connection (power (cubic meters a day)) | 25.00 |
| Nearest point of connection (diameter(mm)) | |
| Nearest point of connection (distance(m)) | |
| Installation of telephones/internet |
|---|
| Central network (distance(m)) | 500.00 |
| Mobile communication (distance(m)) | 1500.00 |
| Rated price of the ground area supplying with engineering, mln.rub | 28.47 |
| Distance to the large settlements and objects of a transport infrastructure |
|---|
| Remoteness from | Name | Distance (km) |
|---|
| center of municipal formation | Kuschevskaya | |
| nearest settlement | Kuschevskaya | |
| Center of federal subject | Krasnodar city | 220.00 |
| highways (regional, federal value) | Federal motorway Ì-4 "Don" | 10.00 |
| highways of local value | «Kuschevskaya-Starominskaya» | 2.00 |
| nearest railway station | Kuschevka | 1.50 |
| nearest railway | OAO “RGD” | 1.50 |
| airport | Yeysk airport | 112.00 |
| seaport | seaport Yeysk | 112.00 |
| Additional information about the ground area |
|---|
| Special conditions | Air temperature - average annual - +9,1 ° W, max - +42°Ñ, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of win |
| Cost of rent/buy of the ground area, mln. rub | 0.54 |
| Geographical coordinates of object (dd.dddddd) |
|---|
| Latitude (N) | 46.334788 |
| Longitude (E) | 39.35469000 |
| Notes | No |
| Data on the project initiator (in case of existence information about the legal/physical person) |
|---|
| Name / Full name | No |
| Postal address | No |
| Site | No |
| Phone/fax | No |
| E-mail address | No |
| Data about the applicant (executive authority/local government executive authority) |
|---|
| Name | Administration of municipal formation Kushchevsky district |
| Postal address | 352030, Russia, Krasnodar region, village Kuschevskaya, B.E.Moskvicha Lane, 67 |
| Site | www.adm-kush.ru |
| Phone/fax | +7-86168-558-33 |
| E-mail address | economkush@mail.ru |
| Executive (Full name, work position, phone number) | +7 (86168)54101 head of department of investments and interaction with small business of Kulikov Sergey Alexandrovich |