Hot line for investors

+7 861 251 77 64 economkush@mail.ru

Placement of the mall

Documents

General information about the ground area
Planned use of ground areaPlacement of the mall
BranchConsumer sphere
Address of the areaKrasnodar region, Kushchevsky district, village Kuschevskaya, Kubansky Lane, 80A
Cadastre account of ground areaRegistered
Cadastre number of area/of quarter23:17:1401035:400
Declared area (m2)14767.00
Limit size of the area (m2)14767.00
Land categoryLands of inhabited localities
Kind of allowed useBusiness building
Actual useIt not used
Permits, town-planning documentationThe master plan of the Kushchevsky rural settlement in relation to a part of the territory of village Kuschevskaya approved by the decision of Council of the Kushchevsky rural settlement from 06.29.2011 year No. 174.
Information on a property
Short description of propertyNo
Cost of property, million rub. 
Information about proprietor (right holder)
ProprietorState ownership
Right holderState ownership in charge of administration Kushchevskaya of rural settlement.
Kind of rightConstant (termless) using
Information on the bankrupted enterprises
Name of bancrupcy procedure, date of introductionno
Market cost of the real estate (according to the report on an assessment in case of its carrying out). Total cost 
Cost of land plot property 
Information on carrying out an assessmentno
Information on carrying out (planning) of the auction on sale of the deptor`s propertyno
Initial price 
Information about encumbrance and limitation
Kind of encumbrance, limitationObject of incomplete construction
Encumbrance area780.16
Electricity supply
Power supply center (name, right-holder)PS 35/10 “Pervomaiskaya Joint stock company "Kuban power"
Power supply center (electrotension class)Middle class of tension – from 1 kV to 35 kV
Power supply center (free power (MWt))1.00
Power supply center (distance(m))10000.00
Nearest connection point (network tension, kV)10.00
Nearest connection point (distance(m))10.00
Gas-supplying
Gas pipeline (name, right-holder)GVD Factory JSC Gazprom
Gas pipeline (diameter(mm))100.00
Gas pipeline (pressure(MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Gas pipeline (carrying capacity(cube. m.in a year))21000000.00
Gas pipeline (distance(m))825.00
Nearest connection point (diameter(mm))100.00
Nearest connection point (pressure (MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Nearest connection point (carrying capacity (cubic meter a year)) 
Nearest connection point (distance(m))825.00
Water-supply
Water supply source (name, right-holder)Water supply system, administration of the Kushchevsky rural settlement
Water supply source (power (cubic meters a day))100.00
Water supply source (quality of water)Service and drinking water
Water supply source (distance(m))30.00
Nearest connection point (power (cubic meters a day)) 
Nearest connection point (diameter(mm))100.00
Nearest connection point (distance(m))30.00
Sewage system
Type of building (name, right-holder)Construction of a tight septic tank
Type of building (power (cubic meters a day))5.00
Type of building (distance(m)) 
Nearest point of connection (power (cubic meters a day)) 
Nearest point of connection (diameter(mm)) 
Nearest point of connection (distance(m)) 
Installation of telephones/internet
Central network (distance(m))650.00
Mobile communication (distance(m))800.00
Rated price of the ground area supplying with engineering, mln.rub.10.70
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal formation Kuschevskaya 
Nearest settlement Kuschevskaya 
Center of the subject of federation Krasnodar220.00
Highways (regional, federal value) Federal motorway М-4 "Don"10.00
Highways of local value Starominskaya - Kushchevskaya0.20
Nearest railway station Kuschevka2.50
Nearest railway SKZD2.50
Airport Yeysk airport120.00
Seaport seaport Yeysk120.00
Additional information about the ground area
Special conditionsAir temperature - average annual - +9,1 ° W, max - +42°С, minimum-37°S; Frost line of soils – 0,8 m; Ground water table – roughly 6-7 m; Seismicity of region on CNaR and a map of seismic micro dividing into districts – 6 points; Directions of winds – east and north-east; District landform, direction of a common grade – quiet, even; a grade 2 the northwest; Possibility of an underflooding - is absent;
Conditions of investor participationRedemption
Cost of rent/buy of the ground area, mln. rub.10.80
Geographical coordinates of object (dd.dddddd)
Latitude (N)46.54207300
Longitude (E)39.61859200
Notes-
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameno
Postal addressno
Siteno
Phone/faxno
E-mail addressno
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal formation Kuschevsky district
Postal addressRussia, Krasnodar region, village Kuschevskaya, B.E.Moskvicha Lane, 67
Sitewww.adm-kush.ru
Phone/fax+7-86168-558-33
E-mail addresseconomkush@mail.ru